Monday, December 21, 2009

The Busy Holiday Week




With a short week because of the upcoming holiday, projects are in full swing. The guys are all in the shop today trying to tie up any and all small projects. First, there was a pair of black dinner chairs that needed to be welded back together. Jose took care of that within the first couple hours and moved on to a handrail with a mean curve on it. Actually there are two curved handrails in the shop right now in the beginning stages of fabrication. Sean was helping hold the rail in place as they did some preliminary welds to solidify the shape of the rail. By now they are probably both welding the legs on them. Juan is completing two detailed gates that he has fabricated from scratch with half inch square steel bars. The first thing he did was bend all the bars to match each other. Then he placed it all together and started on his spot welds. It is looking like they should be ready for galvanization or paint by the end of the short week. Juan also just completed some two inch square aluminum gates that look super clean and are so much lighter than their steel counterparts. The day is coming to a short end because today is our holiday dinner/lunch at the fabulous Olive Garden. With hearty food, great company, and a covered tab the rest of the day for Morena Welding Inc. will be filed with extra happy campers.

0 Comments:

Post a Comment

<< Home